A modern and efficient factory !
Our current site was built in 1992, we are located in the southern industrial zone in Vendôme (41-Loir et cher - France)
We have 1100 m², our factory consists of a machining production part, an air-conditioned measurement control room, a pressure metrology assembly room and an air-conditioned calibration laboratory, and offices.
AREMECA has its own production workshop and regularly invests in modern and efficient machines. Our investments relate in particular to more precise, faster or multifunction machines to achieve a high level of technical performance. This is how we control the quality of our parts.
We have an air-conditioned assembly room where spare parts and assembled products are stored. This allows us to respond reactively to our customers' requests.
Our calibration laboratory is equipped with pressure standards allowing controls up to 10,000 bar. One of our next investments concerns the implementation of the COFRAC accreditation of our laboratory.